BIM Digital Platform | Civic Cultural Center
BIM PROJECT
{{ currentSlideData.applicationDomain }}
CORE VALUE
{{ currentSlideData.coreValue }}
TYPICAL SCENARIOS
  • {{ scenario }}
🏆 FLAGSHIP PROJECT
Municipal Cultural Complex
📐 118,000 m² GFA
🏗️ Steel-concrete
📍 East China
🎯 LOD 400
👥 36 Subcontractors
⚙️ 21 MEP Systems
{{ metric.value }}{{ metric.unit }}
{{ metric.label }}
{{ metric.sub }}
📊 BIM Performance Dashboard
📌 Project Overview

This key municipal public cultural project integrates cultural center, library, grand theater, and digital cinema across 118,000 ㎡. With 21 MEP subsystems and 36 subcontractors, full-process BIM consulting enabled multi-disciplinary integration, clash detection, 4D simulation, and 5D cost control.

⚡ Project Challenges
  • Multi-disciplinary Coordination – 36 participating units, high risk of distortion.
  • Complex MEP Conflicts – 21 subsystems, dense pipelines, strict headroom.
  • Special-shaped Construction – Hyperbolic GRG ceiling with 1,623 unique panels.
  • Tight Schedule Pressure – Early delivery required by owner.
✨ BIM Solutions
  • Five-party BIM Central Collaboration – Unified platform, 24h change response.
  • Three-stage Clash Resolution – 2,864 clashes solved pre-construction.
  • 4D Schedule Dynamic Control – Auto-alert for 3-day deviations.
  • Digital Construction Briefing – QR codes & VR roaming, ceiling 45d→28d.
🏆 Project Outcomes
28 days ahead delivery
¥7.46M total cost saved
98% MEP success rate
99% as-built completeness

🍪 We value your privacy

We use cookies to enhance your browsing experience, serve personalised ads or content, and analyse our traffic. By clicking "Accept All", you consent to our use of cookies.